Asbestos, lead and mould monitoring and hazardous materials surveys for renovation, demolition and abatement projects. Same-day fibre counts on site.
Our technicians handle the site work from first survey to final clearance, so one team is accountable for the results.
Testing a ceiling, floor or drywall before a renovation, with results explained in plain language.
Typical requestPre-renovation asbestos survey
Air monitoring, clearances and HEPA testing booked around your crew's schedule.
Typical requestDaily air monitoring and final clearance
Hazardous materials surveys and inventories for older buildings, kept on file for future work.
Typical requestBuilding-wide hazmat inventory
Pre-demolition surveys and scopes so abatement can be priced before the job starts.
Typical requestPre-demolition survey and abatement scope
Address, age of the building, and what work is planned.
A technician visits, collects samples and logs them on a chain of custody form.
Air cassettes are counted on site. Other samples go to an accredited laboratory, with rush turnaround available.
Clear results with what they mean for your project and what to do next.
If it was built before 1990 and the work will disturb drywall, flooring, ceilings, insulation or plaster, yes. Many contractors will not start without a test result.
Asbestos air cassettes can be counted on site the same day. Lead, mould and building material samples are sent to an accredited laboratory and normally take two to five business days, with rush available when booked ahead.
After abatement, air samples are taken inside the work area. If fibre levels are below the clearance limit, the area can be opened and used again.
Call the office for same-week site visits and rush results, or send the site details and we will reply with a quote.